Mechanical trenching underway in 1967 at the Devil's Mouth site. Here a front-end loader is being used to remove overburden in an attempt to understand the stratigraphic relationships between the deeper layers exposed in several separate excavation blocks dug in 1962. Photo by E. Mott Davis, TARL archives. |